DA221920
|
Material Change of Use for Public Utility (1,400 MW power station and associated infrastructure including access roads and substation); Environmentally relevant activities (ERA14 – electricity generation, ERA 16 – extractive and screening activities, ERA 50 – mineral and bulk material handling, ERA 60 – waste disposal and ERA 63 – sewerage treatment); and Hazardous chemical facility.
|
3260 Monklands Road, Alpha formally described as Lot 2 on SP13683
|
No public notification required
|
Response to Further Issues (SARA)
|
Application documents
- Covering letter
- DA Form 1
- EA Application Form
- Form 69 – Notification of a facility exceeding 10% threshold
- Landowners consent
- Town Planning Report – Final Version
- Appendix A – Air Quality Assessment Report
- Appendix B – Acoustic Assessment
- Appendix C – Fauna Assessment
- Appendix D1 – Traffic Impact Assessment
- Appendix D2 – Traffic Consultant Technical Note
- Appendix E – Preliminary Hazard Analysis
- Appendix F – Prelodgement Meeting Record (10 May 2019)
- Appendix G – Prelodgement Meeting Record (18 November 2019)
- Appendix H – Technical Notes on Air Quality Report
- Appendix I – Preliminary Site Stormwater Management Plan
- Appendix J – Watercourse Determination Memo
- Technical memo for remnant vegetation
- Concept Engineering Drawings
- Ergon Energy Referral Agency Response
- SARA Information Request
- Council Information Request (inc DNRME Advice)
- Further Advice Notice (31 August 2020)
- 20200923 Covering letter to BRC FINAL
- Attachment 1 Social Impact Assessment (Version B)
- Attachment 2 Alpha Township Electrical Reinforcement Memo
- Attachment 3 Preliminary Alpha Airport Design
- Attachment 4 Traffic Impact Assessment (Version D)
- Attachment 5 Concept Design Plant Plan
- Attachment 6 Letter of Support
- Attachment 7 and Attachment 8 - Sewage and Landfill
- 20201016 MCU Public Utility SARA agreement to timeframe extension
- 20201208 MCU Public Utility Further Response to Issues (SARA)
- 20201104 MCU Public Utility SARA Reponses with appendices
|
DA192021 |
Development Permit for Operational Work – Filling and Excavation and Category 2 Levee |
Lots 1-11 RY185; Lot 7 SP243955; Lot 81 SP246238; Lot 1 SP252172; Lot 1 SP223525 and Road Reserve |
No public notification required |
Confirmation Advice |
Application documents
- Application – Part A (Cover Letter, DA Form 1, Planning Report, Barcaldine Flood Hazard Assessment Study, Levee Operations and Maintenance Manual)
- Application – Part B
- Application – Part C
- Application – Part D
- Application – Part E
- Application – Part F
- Confirmation Notice
|