Alice River Bridge - Landsborough Highway (Blackall – Barcaldine) - Side-track in use

The Department of Transport and Main Roads (TMR) advises that traffic on the Landsborough Highway at the Alice River Bridge near Barcaldine will use the sealed, two-lane side-track from 21 June 2022.

Moving traffic to the side-track enables the final stages of rehabilitation works on the bridge, which are expected to be completed by late September 2022. 

The side-track will operate with a speed restriction of 60km/hr. 

Motorists are reminded to be aware of these traffic conditions and to follow the direction of traffic control and roadworks signage at this location. 

For more information, please contact TMR in Barcaldine on 4651 2777 during business hours or email barcaldine.office@tmr.qld.gov.au

Published: 22nd June 2022